Case study

Warehouse Roof Waterproofing

Industrial Waterproofing Karachi 18,000 sq ft 10 days

Challenge

Water ingress through an aged roof surface.

Scope

Roof waterproofing of a large storage building.

System used

  1. 01 Roof preparation
  2. 02 Primer
  3. 03 Waterproofing membrane
  4. 04 Protective coat

Project stages

Before
During
After

Result

A sealed roof protecting stored goods and the building structure.