Case study

Warehouse Floor Coating

Industrial Floor Coating Lahore 22,000 sq ft 14 days

Challenge

Heavy traffic and dust from an unprotected concrete floor.

Scope

Protective floor coating for a logistics warehouse.

System used

  1. 01 Floor grinding and dust removal
  2. 02 Primer
  3. 03 Industrial floor coating system

Project stages

Before
During
After

Result

A durable, cleaner floor surface suited to daily operations.

Related projects

Planning work like Warehouse Floor Coating? Let’s talk through your project.
Discuss this project on WhatsApp