Project image unavailable
Case study
Residential Roof Waterproofing
Residential Waterproofing Sheikhupura 2,400 sq ft
5 days
Project photography is not available yet.
Challenge
Damp patches on ceilings below the roof during rain.
Scope
Roof surface preparation and waterproof membrane application.
System used
- 01 Roof cleaning and crack treatment
- 02 Primer
- 03 Waterproofing membrane
- 04 Protective top layer
Project stages
Before image unavailable
During image unavailable
After image unavailable
Result
A sealed roof surface protecting the structure from water penetration.
Related projects
Project image unavailable
Project image unavailable
Planning work like Residential Roof Waterproofing? Let’s talk through your project.Discuss this project on WhatsApp